971  (b)  after  due  consideration  has  been  given  to  primary  services  over  and  above  secondary  services  (2)  Applicants  for  authorization  to  operate  new  transmitting  facilities  or  changed  transmitting  facilities  located  in  the  vicinity of  an  existing  station,  including  a  Authority monitoring  station,  where  the  new  facility  would  increase  the  field  strength  produced  over the  existing  station  beyond  that  previously authorized  shall  ensure to give consideration prior to filing applications, to­  (a)  the possible need to protect existing stations from harmful interference; and  (b)  the protection of existing radio transmission stations  (3) Applicants  who  have  no  reliable  data indicating  the field  strength  or power flux  density of their  proposed  radio  facilities,  which  could  cause  interference  to  existing  stations,  may  conduct  advance  consultation  Obligations of licensees  72. A licensee assigned the use of frequencies or frequency bands shall­  (a   maintain  and  provide,  at  the  Authority’s  request,  an  inventory  of  frequencies  assigned  to  the licensee; ­  (b)  pay the annual utilization fee as determined by the Authority beginning on the effective date  of the licence;  (c)  co­ordinate  the  use  of  frequency  or  frequency  bands  with  other  licensees.  Where  competing  providers  seek  the  use  of  the  same  or  similar  frequency,  each  is  required  to  participate in the co­ordination of such frequency under the auspices of the Authority;  (d)  submit  to  the  modification  of  the  order  granting  use  or  allocation  of  frequency,  as  the  Authority  deems  necessary  to  promote  the  most  efficient  use  of  the  radio  frequency  spectrum; and  (e)  ensure  avoidance  of  harmful  emission  interference  or  illegal  use  of  the  radio  frequency  spectrum  Transfer and assignment of station authorization  73. (1) The manner in which a request to transferor assign a licence for an entire system may be made is by  submitting to the Authority­  (a)  the request on form similar to form LTA 12 as shown in the Schedule to the Rules; and  (b)  the appended Station Authorizations covered by the licence  (2)  Requests  for  authority  to  transferor  assign  multiple  Station  Authorizations  may  be  filed  together  in  a  single document­ Provided that each separate Station Authorization is identified and fully described  Filing of applications  74.  (1)  To  ensure  uniformity  and  consistency  of  the  manner  in  which  applications  and  reports  are  to  be  submitted for Authority consideration, standard forms are prescribed in the Schedule to these Rules.  (2) Any application shall be filed at least 30 days prior to the date on  which it is desired that Authority action  thereon be completed.

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents