971
(b)
after due consideration has been given to primary services over and above secondary
services
(2) Applicants for authorization to operate new transmitting facilities or changed transmitting facilities
located in the vicinity of an existing station, including a Authority monitoring station, where the new facility
would increase the field strength produced over the existing station beyond that previously authorized shall
ensure to give consideration prior to filing applications, to
(a)
the possible need to protect existing stations from harmful interference; and
(b)
the protection of existing radio transmission stations
(3) Applicants who have no reliable data indicating the field strength or power flux density of their proposed
radio facilities, which could cause interference to existing stations, may conduct advance consultation
Obligations of licensees
72. A licensee assigned the use of frequencies or frequency bands shall
(a
maintain and provide, at the Authority’s request, an inventory of frequencies assigned to
the licensee;
(b)
pay the annual utilization fee as determined by the Authority beginning on the effective date
of the licence;
(c)
coordinate the use of frequency or frequency bands with other licensees. Where
competing providers seek the use of the same or similar frequency, each is required to
participate in the coordination of such frequency under the auspices of the Authority;
(d)
submit to the modification of the order granting use or allocation of frequency, as the
Authority deems necessary to promote the most efficient use of the radio frequency
spectrum; and
(e)
ensure avoidance of harmful emission interference or illegal use of the radio frequency
spectrum
Transfer and assignment of station authorization
73. (1) The manner in which a request to transferor assign a licence for an entire system may be made is by
submitting to the Authority
(a)
the request on form similar to form LTA 12 as shown in the Schedule to the Rules; and
(b)
the appended Station Authorizations covered by the licence
(2) Requests for authority to transferor assign multiple Station Authorizations may be filed together in a
single document Provided that each separate Station Authorization is identified and fully described
Filing of applications
74. (1) To ensure uniformity and consistency of the manner in which applications and reports are to be
submitted for Authority consideration, standard forms are prescribed in the Schedule to these Rules.
(2) Any application shall be filed at least 30 days prior to the date on which it is desired that Authority action
thereon be completed.
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents