– – Remove adjacent paving materials which were damaged as a result of excavation; Fulfill the cleaning conditions required by local authority and other concerned authorities. III.3.6: Trenching Guidance During the installation in trench the following should be obeyed a. Fiber optic cables shall be laid in trenches; Trenches along road networks shall be sufficiently deep to provide appropriate fiber cable protection and shall be placed at least 1.5m away from the edge of pedestrian walkways or storm drainages along paved roads. In case of unavailability of the required clearance distance due to the soil or terrain condition; the special request for shorter clearance shall be sent to the Regulatory Authority, who will assess and provide the feedback based on case specifications; b. In the absence of pedestrian walkways, the cable must be located at a minimum distance of 2.5 meters off the roadway. In case of unavailability of the required clearance distance due to the soil or terrain condition; the special request for shorter clearance shall be sent to the Regulatory Authority, who will assess and provide the feedback based on case specifications; c. Road surfaces where cable crossings have been installed shall be restored to its original state in compliance with local authorities and other concerned authorities specifications; d. No cable installation will be permitted in a ditch line. Cable installations will be permitted along the back of the ditch line only; e. Where there are cable crossings along roads, ducting shall be of galvanized steel pipes buried deep enough (1m or more) for protection from vehicular or pedestrian traffic stresses. Similar galvanized steel pipe ducts shall be used at bridge crossings. III.3.7:Trenchless Techniques Trenchless techniques shall be used to reduce environmental damage, social costs and provide an economic alternative to open-trench methods of installation. Trenchless or no-dig technique used for long section FOC installation should be divided into shorter sections of the work length accordingly to the characteristics of the machines and the design requirements. 9

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents