Activities:
1. Develop legal, regulatory and institutional framework
2. Develop and implement a technical framework
3. Develop an implementation plan
4. Build local capacity to manage CNS-ATM
5. Acquire and deploy CNS-ATM equipment
6. Increase awareness and sensitization around this initiative within the region
Expected Outcome:
1. Improved national and regional airspace safety and security
2. Improved airspace and airport operational efficiency
3. Increased availability of user-preferred flight schedules and profiles thereby positioning
Rwanda as a logistics hub
4. Minimised deferring of equipment carriage in the region
5. Generate income for the country
6. Elevate Rwanda’s ICT status
Outcome Indicators:
1. CNS-ATM fully operational by 2013
2. Number of flights to Rwanda
3. Number of incidents in flight control
Page 67 of 85
© No part of this document can be reproduced, stored in a retrieval system, or transmitted in any form or by any means - electronic,
mechanical, photocopying, recording, or otherwise - without the permission of Rwanda Ministry in charge of ICT in the Office of the
President.
اختر الفقرة المستهدفة3
الاتصال بفقرة
Connect to an entity
Disable highlights
أضف إلى جدول المحتويات