III.3.9: Crossings – All crossings are to be made perpendicular to the roadway. – Road crossing machines should be used with a depth of not less than 1m. – Any cables should be protected with appropriate ducts along the whole crossing length. III.3.10: Duct Sharing Fiber Optic installation conductor shall install at least two (2) pipes with a minimum of twelve (12) cores on access network and 4 ducts on backbone network in order to facilitate fiber and duct sharing. The payment of these reserved pipes and cores by a new operator will follow the Guidelines for fiber and duct sharing. III.3.11: Sharing Point and Shared Building Cabling The shared building cabling and sharing point for fiber installation in building with multiple operators is mandatory in order to: – Reduce fiber installation and maintenance costs in the building – Reduce disturbance (noise, infrastructure works, dust…) for inhabitants – Avoid cabling duplication if more than one Fiber to the home (FTTH) operators are in a building The Shared building cabling combined with the sharing point should support both Point to Point and Point to Multipoint access network topologies. The first applicant to connect a building should provide a sharing point that might support sharing of four operators in case of need to share the cable. 11

اختر الفقرة المستهدفة3

الاتصال بفقرة
Connect to an entity
Disable highlights
أضف إلى جدول المحتويات