Appendix5. Summary of Values Recommended by These Guidelines No Item Value 1 Excavation and backfilling duration ≤3days 2 Excavation notification to the other utilities ≥ 5 days before commencement operators 3 Distance of cable from the edge of shoulder 1.5m 4 Minimum distance of the cable from the off of roadway 2.5metres 5 Interval distance between FOC and existing 1m underground infrastructure 6 Trench depth ≥80cm 7 Trench depth while road crossing ≥1meter 8 Visible tape along the trenches below 30 cm ground surface. 9 Interval distance between two visible tape 300m to 500m marker indicating cable route 10 Distance of Manhole/Hand hole from the 2metres edge of shoulder 11 Minimum distance of the Manhole/Hand hole from the off of roadway 3m 12 Accomplishment report submission ≤5 working days from mentioned on the schedule 13 As-built documentation report submission ≤30 working days from the date mentioned on the schedule 14 Right of way permit delivery 10 working days 15 Right of way permit validity 3months 18 the date

اختر الفقرة المستهدفة3

الاتصال بفقرة
Connect to an entity
Disable highlights
أضف إلى جدول المحتويات