Parameter
Definition
Formula
Target
VoLTE Session
Setup Failure
Ratio [%]
The probability that the VoLTE terminal cannot
setup a session.
VoLTE Session Setup Failure
Ratio = (unsuccessful VoLTE
session setup attempt/ all VoLTE
session setup attempt) X100%
≤ 2%
Return to 4G
Time (LTE
Networks)
Return to 4G/LTE time is the average time (in
seconds) it takes for a 4G/LTE call to return to
form a legacy (2G/3G) network after a call has
ended
𝑅𝑒𝑡𝑢𝑟𝑛 𝑡𝑜 4𝐺/𝐿𝑇𝐸[𝑠] = 𝑡first
System information block in LTE received − 𝑡call
≤5 seconds
fall back time
from active
state
disconnected
≤10 seconds
fall back time
from idle
state
5. QUALITY OF SERVICE PARAMETER FOR INTERCONNECTION
Every Telecommunications Operators shall meet the following Quality of Service standards set for
any interconnected service in respect of each specified parameter measured by real calls on any
interconnected route and shall submit a periodic report based on daily peak hour conditions.
Table 5: Quality of Service Parameter for Interconnection
Parameter
Definition
Formula
Interconnection Route
Utilization
The percentage of
provisioned
interconnection route that
is carrying traffic
Interconnection Route
Utilization= (Total Capacity in
use/Capacity Provisioned)
X100%
70%
Mean Time To Repair
(MTTR) Interconnection
Route
The duration from a
reported interconnection
fault to service on Route
restoration
Mean Time To Repair
(MTTR) Interconnection
Route=Time Service
Restored-Time Fault Reported
1 hour
Point of Interconnection
(PoI) Congestion
The ratio of calls failed
over the POI (between
two Telecommunications
Operators) due to
unavailability of free
circuits to the total call
requests for seizure of
POI circuit.
POI congestion = failed call
requests over the POI due to
unavailability of free circuits/
(total call requests for seizure of
POI circuit)x100%
< 0.5%
Time-frame for activation
of a new POI
The time frame for
activation of a new POI is
the time duration
permitted for
commissioning of
interconnect capacity or
link after confirmation or
acceptance of demand for
interconnect capacity
provisioning and
commissioning
Counted from the date of
confirmation or acceptance of
demand for POI connectivity
90 days
17
Target
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents