Parameter
Formula
Target
Urban
Time to
Restore
Service
(TTR)
Rural
Time service restored - Time reported
85% in 24 H and 99% in 72H for radio BTS (2G, 3G,
4G)
95% in 12H for BSC/RNC (2G, 3G)
95% in 6H for commutation (2G, 3G, 4G)
95% in 24H for local transmission (2G, 3G, 4G)
7. NON-TECHNICAL QUALITY OF SERVICE PARAMETER FOR ALL SERVICES
Every Service Providers shall meet the following non-technical Quality of Service standards set
for all services in respect of each specified parameter measured by test traffic in any locality and
shall submit a report in the reporting period based on daily conditions.
Table 7: Non-Technical Quality of Service Parameter for all Services
Parameter
Measurement Method
Description
Target
Formula
Urban
Service Availability
Service Availability means the
percentage of the time a system
stays operational over a period of
time.
(Total Operational hours
over a reporting period –
Total downtime over a
reporting period) / Total
operational hour over a
reporting period X 100%
>95%
Supply time for
initial connection
The duration from the instant of a
valid service order being received
by a direct Telecommunications
Operator to the instant a working
service is made available for use.
Time Service OperationalTime Payment of Service
≤5 working days
Fault Repair Time
The duration from the instant a
fault has been notified by the
customer to the published point of
contact of a Telecommunications
Operator to the instant when the
service element or service has been
restored to normal working order.
The time taken to restore a
service to working order
after receiving valid fault
reports.
Fixed Services :
≥ 90% in five
(5) working
days
Mobile Services:
≥ 90% in two
(2) working
days
Fault Report
Submission Rate
The number of valid fault reports
received by an operator per
customer per reporting period.
Number of valid fault
reports per access line per
Reporting Period
19
Rural
>90%
Fixed
Services:
≥ 80% in five
(5) working
days
Mobile
Services:
≥ 85% in
three (3)
working days
<0.002% of customers in the
Reporting Period